Last week, the 35th Street Bridge over I-359 was significantly damaged by a truck with an oversize load. According to the Alabama Department of Transportation, this will take at least 3 months to fix.

The truck was apparently traveling westbound. The two outside lanes on this side will be closed. Of course, this means delays can be expected, and motorists are encouraged to use alternate routes to circumvent the area, allot more time for travel when going this route, and observe safety precautions.

More From 92.9 WTUG